• Menu
  • Skip to right header navigation
  • Skip to main content
  • Skip to secondary navigation

T & T Construction

Your Trusted Construction Partner.

  • Home
  • Why T & T Construction
  • Projects
  • Contact Us
  • Home
  • Why T & T Construction
  • Projects
  • Contact Us

Government Projects

Anderson Pool and Roof

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2017 Project Dollar Value – $2,946,133 Project Description – Complete renovation of pool house and pool. Removal of all building exterior cladding down to aluminum super structure. New split face block, storefront windows and insulated metal wall and roof panels on the exterior. Pool coating sandblasted down to bare concrete and …

Anderson Pool and RoofRead More

Category: Government Projects

Cannelton Locks and Dam Tainter Gate Repairs

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2019 Project Dollar Value – $1,013,129 Project Description –

Cannelton Locks and Dam Tainter Gate RepairsRead More

Category: Government Projects

Mason Run Streambank Stabilization

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2019 Project Dollar Value – $1,451,821 Project Description –

Mason Run Streambank StabilizationRead More

Category: Government Projects

Patton Museum Roof & HVAC

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2018 Project Dollar Value – $4,548,692 Project Description – The project consisted of the demolition of various objects to include but limited to the existing roof down to the metal deck, roof top package HVAC units and associated ductwork, concrete flat work, flagpole and memorial brick pavers. The flagpole and memorial …

Patton Museum Roof & HVACRead More

Category: Government Projects

Building 1467 Paver Field

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2018 Project Dollar Value – $440,223 Project Description – Construct approx.. 150’x150’ paver parade field. Work consisted of site excavation, sub drainage, concrete curb and gutter. Portion of paver parade field includes a section of roadway. Special construction was needed to reinforce this section of the paver field.

Building 1467 Paver FieldRead More

Category: Government Projects

Building 1467 Renovation

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2017 Project Dollar Value – $12,072,730 Project Description – Renovation of 120,000 SF historical facility. Work included complete removal of all interior finishes and walls, building systems (electrical, HVAC, communications, sprinkler and fire alarm). New construction consists of new walls, floor and ceiling work to accommodate mission requirements, new building systems …

Building 1467 RenovationRead More

Category: Government Projects

Red Carpet Taxiway, Scott Air Force Base

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2020 Project Dollar Value – $1,071,407 Project Description –

Red Carpet Taxiway, Scott Air Force BaseRead More

Category: Government Projects

Remove Lake Taal Dam

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2017 Project Dollar Value – $1,420,026 Project Description – Removal of a flood control dam that was no longer needed. Project size was 18 acres +/-. Length of damn was approx. 600’ and a height of 30’. Project include moving ?? cubic yards of soils and placement of over 3000 Tons …

Remove Lake Taal DamRead More

Category: Government Projects

Grissom Taxiway G

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2018 Project Dollar Value – $5,351,646 Project Description – T&T completed a full-depth replacement renovation of Taxiway G. This project included the demolition, pavement placement, joint sealant placement, pavement markings, shoulder work and related tasks to sustain Taxiway G. This project was designed to meet UFC criteria. Construction was completed in …

Grissom Taxiway GRead More

Category: Government Projects

Phase 3B-3 at White River, Indianapolis, IN

June 15, 2020 //  by tandtconstruct

Project Completion Date – 2019 Project Dollar Value – $11,026,186 Project Description – Work consisted of construction approx. 4,210 LF of Sheet pile I-wall with cast-in-place concrete stone form liner. Approx. 1650 Lf of toe drain, two gate well structures and 5,478 LF of multi-use trail way. Construct approx. 700 Lf of passive flood control …

Phase 3B-3 at White River, Indianapolis, INRead More

Category: Government Projects

  • Go to page 1
  • Go to page 2
  • Go to Next Page »
  • Home
  • Why T & T Construction
  • Projects
  • Contact Us

Site Footer

T & T Construction

4375 Lilac Rd, Leitchfield, KY 42754

Main Office: 270-230-1117

Main Office Fax: 270-230-0366

Fort Knox Office: (502) 684-7091

Fort Knox Office Fax: 502-684-7029

Copyright © 2023 · Mai Law Pro on Genesis Framework · WordPress · Log in