- Project Completion Date – 2019
- Project Dollar Value – $11,026,186
- Project Description – Work consisted of construction approx. 4,210 LF of Sheet pile I-wall with cast-in-place concrete stone form liner. Approx. 1650 Lf of toe drain, two gate well structures and 5,478 LF of multi-use trail way. Construct approx. 700 Lf of passive flood control wall. Work also included gate canal structure across the Citizen’s Energy Group Canal.