
- Project Completion Date – 2018
- Project Dollar Value – $440,223
- Project Description – Construct approx.. 150’x150’ paver parade field. Work consisted of site excavation, sub drainage, concrete curb and gutter. Portion of paver parade field includes a section of roadway. Special construction was needed to reinforce this section of the paver field.
Leave a Reply