Ireland Army Hospital – Pathology Lab – Initial Project
- Project Completion Date – 2015
- Project Dollar Value – $3,433,334
- Project Description –
Ireland Army Hospital – Pathology Lab – Renovation
This Design/Build project included the construction of a 5,000sf Laboratory as well as the renovation of a 1950’s era 12,000sf Lab. 5,000sf Lab is completed and consisted of the re-purposing of a classroom facility into a laboratory. The 12,000sf renovation which is currently finishing construction consist of a full gut and reconstruction to include redesign of all systems to increase productivity and flow through the space, reworking all Mechanical, electrical, plumbing, Fire Alarm, Sprinkler, Walls, and All finishes throughout. All is being completed using stringent infection control measures.